| 1 |
Gate Valve - Component, Working,
Hydrotest |
| 2 |
Valve - Pressure Test Duration
per API 598 |
| 3 |
Specified Minimum Tensile
Strength (SMTS) |
| 4 |
Basis of Allowable Stress in
Design of Pressure vessel, Piping, Storage Tand |
| 5 |
Pipe Calculation - Barlow's
Fomula |
| 6 |
Erosion by Steam and Condensate |
| 7 |
Cyclone Separator |
| 8 |
Glove Valve - Component, Working |
| 9 |
Likely Locations of CUI in
Pressure Vessel and Piping |
| 10 |
Cooling Tower - Component,
Working |
| 11 |
Steam Erosion on Flange Face |
| 12 |
RT film Density - Definition,
Measurement |
| 13 |
Pipe Supports Inspection -
Spring Hanger |
| 14 |
Conventional Pressure Relief
Valve - Component, Working |
| 15 |
Balanced Bellow Pressure Relief
Valve - Component, Working |
| 16 |
Pressure Relief Valve - Test
gag, Backpressure, Accumlation and Overpressure, Cold Differential Test
Pressure (CDTP), Pressure Level Relationships, Valve Action VS Inlet
Pressure, Maximum Set Pressure & Accumulation, Simmer, Blowdown |
| 17 |
Full Vacuum Condition (FV) of
Pressure Vessel |
| 18 |
Maximum Allowable Working
Pressure (MAWP) of Pressure Vessel |
| 19 |
Field Metallographic Replication
(Replica) |
| 20 |
Rupture Disk |
| 21 |
ASME Certification Mark of
Pressure Relief Valve |
| 22 |
Stress in Cylindrical Component
(Vessel, Piping) |
| 23 |
Coalescer |
| 24 |
Flanged Joint Inspection -
Thread Engagement, Corrosion on Flange Fastener |
| 25 |
Detail on Spring Support |
| 26 |
Repair of Anchor Bolt using
Sleeve Coupling |
| 27 |
Usability of Carbon Steel in
Caustic Soda Service to Prevent Cracking |
| 28 |
Steam Trap - Why Steam Trap,
Working, Type, Inspection |
| 29 |
Radiography Testing (RT) -
Backscatter |
| 30 |
Pressure Relief Valve Testing -
Pop test (Set Pressure Test), Blowdown, Test, Stand, Seat Tightness Test,
Field Test, Trevitest |
| 31 |
Repair of Pressure Vessel -
Fillet Welded Patch, Insert Plates |
| 32 |
Profile Radiography - U-Tube,
Nozzle, Socket Weld Gap |
| 33 |
Electrochemical Reaction of
(Water) Corrosion |
| 34 |
Corrosion Rate for New Vessel
and Service Change |
| 35 |
Pneumatic Testing Steps for
Pressure Vessel |
| 36 |
Oxygen Scavenger (Corrosion
Inhibitor) |
| 37 |
Certification Mark of Pressure
Vessel (U Stamp) |
| 38 |
Hydrostatic Test Pressure for
Pressure Vessel |
| 39 |
Flange Marking per ASME B16.5 |
| 40 |
Piping Inspection - Corrosion
Under Support (CUS) |
| 41 |
Holiday Test - Low Voltage Wet
Sponge, High Voltage |
| 42 |
Rubber lining Inspection |
| 43 |
Design of Termination of
Insulation to prevent CUI |
| 44 |
Burning of Flammable Liquids |
| 45 |
Flash Point, Autoignition
Temperature, Boiling Point |
| 46 |
Storage Tank Inspection - Sign
of Water Ingress |
| 47 |
Steam Distribution System |
| 48 |
API 650 Storage Tank - Bottom
Plate Extension, Offset of Vertical Shell Joints |
| 49 |
External Evidence of Caustic
Leak and follow-up Inspection |
| 50 |
Lamellar Tearing |
| 51 |
Soil to Air Interface of
Underground Piping |
| 52 |
Tension Test Acceptance Criteria
per ASME IX |
| 53 |
Static Head in Pressure Vessel |
| 54 |
An effective way to find the
corrosion pits by Visual |
| 55 |
Vortex Breaker - What Vortex,
Why Vortex Breaker, Type, Example |
| 56 |
Vibration Induced Fatigue -
What, Where, Example, Inspection Optimization |